Well, it is time for another curb appeal update. The master bath is slowly coming along. Our tile contractor still has about a week to finish but things are finally shaping up. Tomorrow they are grouting the shower and finishing more walls. After all the walls are done they will tile the floor, then put the new toilet in, install the tub and we can get the shower panel and frameless doors on, the vanity installed, countertop and sinks, all the trim and the paint.
Here is a look at some of the progress since last time:
We need to do a master bath update soon. It is such a big job. Thank you for sharing this