If you have not seen Part 1 of our Kitchen Transformation click HERE. You can also see our video constructions updates for a more in-depth, up close and personal look at everything, including the lessons we learned along the way.
So, the was the first piece of quartz installed. Sorry for the poor lighting, they still had not installed all the lights at this point. Also, outside the kitchen window is a temporary storage shed that will be moved, once we can move our stuff back in.
There will be a false drawer front that matches the cabinets surrounding the farmhouse sink. It is still being made in the factory, but we will show you what a difference it makes when installed. Again, the shed in the back is just temporary.
That is my plumber checking out the island top. I noticed after they left it was not even so they had to come back and redo that and the sink. Fun times.
The opening for the cooktop is cut on site. They bring in a fan that sucks out the dust and through an attached large tunnel tube it is blown outside. They also have a vacuum running.
Once the sinks had set, the faucets were installed along with the dishwasher and cooktop. We also installed the 3 pendant lights over the island and the one over the sink. Then, the rest of the cabinets could be installed.
We need to get the crown molding installed on top of the cabinets and most of the interior cabinet lighting as well as the under cabinet and upper cabinet lighting. The cabinets still need to be aligned and the hardware installed. My biggest problem is, I cannot find a backsplash tile I like. Hope to do that this weekend. We have some more work to do but we have come a long way.